NAHI Standards of Practice

  12. Central Air Conditioning

12.1    Components for Inspection.
 
12.1.1 Cooling equipment.
 
12.1.2 Cooling distribution.
 
12.1.3 Operating controls.
 
12.2 Procedures for Inspection.
 
The Inspector will:

12.2.1 Identify the type of central air conditioning system and energy sources.
 
12.2.2 Operate the system using normal control devices.
 
12.2.3 Open access panels or covers provided by the manufacturer or installer, if readily accessible.
 
12.2.4 Observe the condition of controls and operative components of the complete system, conditions permitting.
 
12.2.5 Observe the condition of a representative number of the central air cooling outlets in each habitable space of the house.
 
12.3 Limitations.

The Inspector is not required to:

12.3.1 Activate or operate cooling or other systems that have been shut-down.
 
12.3.2 Inspect gas-fired refrigeration systems, evaporative coolers, or wall or window-mounted air conditioning units.
 
12.3.3 Check the pressure of the system coolant or determine the presence of leakage.
 
12.3.4 Evaluate the capacity, efficiency, or adequacy of the system.
 
12.3.5 Operate equipment or systems if exterior temperature is below 60° Fahrenheit or when other circumstances are not conducive to safe operation or may damage the equipment.
 
12.3.6 Remove covers or panels that are not readily accessible.
 
12.3.7 Dismantle any equipment, controls, or gauges.
 
12.3.8 Check the electrical current drawn by the unit.
 
12.3.9 Operate digital-type thermostats or controls.

next page

Back to Top Go Back
Updated: 29-May-2003 copyright NAHI™ - reprinted by permission